 First thing was to dig holes, set cardboard cylinders and pour concrete into the cylinders, making pilings. |  The next step was to lay down a pressure treated plate and a band board to form the floor. |
 This shows the floor joists in place. |  So does this. |
 Then we nailed thin plywood on the bottom of the floor joists and laid insulation on top of it. This shows Tyler nailing the hard way. |  After we laid the tongue and groove deck, we laid out and nailed together the first wall which is laying on the deck in this picture. |
 Then we stand the wall up using only brute strength. |  This is the first two walls standing. |
 This shows Tyler and Ed adjusting a wall after they have stood it up. |  This is a closeup of the building when all four stud walls are up. |
|